SPCC Plan Preparation

221 Natural Gas Well Sites
Farmington, New Mexico

Services Provided

Market

Regulatory Agency Involved
U.S. Environmental Protection Agency
Trihydro was contracted to perform site inspections and prepare a field-wide Spill Prevention Control and Countermeasure (SPCC) Plan for 221 natural gas well sites in northwest New Mexico.  The SPCC Plan was prepared in accordance with EPA Regulation 40 CFR Part 112.9.  The well field covered a large geographical area, and required close coordination with the client.  GPS units with pre-loaded maps were used by Trihydro to locate the wells.  

Trihydro understands the importance of preparing and implementing SPCC plans for project sites.  We offer a broad range of services, including: preparing plans, reviewing existing plans, providing recommendations, and performing inspections.  We also have experience in combining SPCC plans with other site plans (i.e., stormwater pollution prevention plans [SWPPP], best management practices [BMP], facility response plans [FRP]) to generate cohesive and efficient compliance documents for end-users.

Our staff has experience working with sites ranging from large industrial facilities to smaller, single tank facilities storing petroleum products.  We work with our clients to determine the most appropriate site-specific solutions to meet current regulatory requirements.  SPCC regulations are continuously, changing and Trihydro is committed to providing clients with the most up-to-date plans.
Back to All Projects
Trihydro prepared a field-wide SPCC plan for this project that saved significantly over preparing individual plans.