PROJECTS

Delivering total client satisfaction is the foundation of all of our projects. Browse this section to learn about projects we have completed to help our clients achieve their site and portfolio goals. Narrow your search by service, market, or region to view our experience on sites similar to yours.


Lead Dust Abatement

Indoor Firing Ranges
Vancouver, Washington

Services Provided

Market

Lead-Dust-Abatement1
Trihydro provided lead dust and debris abatement services in three former indoor firing ranges (IFRs) located on the third floors of three buildings at the Vancouver Barracks in Vancouver, Washington. The IFRs were historically used by army personnel for weapons training and qualifications. The Barracks have since become the property of the National Park Service (NPS) and are now included in the Fort Vancouver National Historic Site (NHS).

The scope of work included construction inspection, quality assurance services, and oversight of the abatement contractor to ensure performance compliance with Army, federal, and state regulations for the abatement of lead dust and debris. The project included monitoring ambient air with respect to lead on the exterior of each containment area during daily work shifts. The monitoring helped prevent a loss of lead from each containment area. At no time was elevated lead indicated in laboratory air sample results.  

Trihydro paid special attention to potentially historic artifacts (PHAs) and graffiti observed on surfaces within each of the IFRs. Items of potentially historic significance as defined by the NPS were accounted for by cataloguing each discovered article and photographing them in place. The artifacts were then cleaned in accordance with the planning documents and presented to the NPS for curation.

As a result, Trihydro successfully preserved historical graffiti, while identifying, decontaminating, and cataloguing over 100 significant PHAs. Trihydro effectively managed and cooperated with multiple teamed partners, subcontractors, stakeholders, and government agencies. Visual inspections were successfully completed and containment clearance was completed on the first attempt with four tons of lead dust/debris removed and disposed of during the project. There was no loss of regulated air to ambient areas and the buildings remained occupied by base personnel during abatement. This project was completed on schedule and under the USACE amended/approved budget with final clearance objectives met in all three buildings. 
Back to All Projects
"The quality of Trihydro's work matches the exemplary nature of the individuals performing them."
- Guillermo J. Silva-Wiscovich, Partner, Morell Bauza Cartagena & Dapena LLC

Trihydro’s success is based on working safely, maintaining high quality, and having strong project managers on the front line. Our considerable technical and regulatory expertise allows us to anticipate challenges, recognize opportunities, and strategically work with you to reach well-defined milestones and clearly defined end-state visions.

Headquarters 307-745-7474  |  Contact Us