St. Jones Riverbank Restoration & Stabilization

Dover Air Force Base
Dover, Delaware

Services Provided

Market

Regulatory Agency Involved
Delaware Department of Natural Resources and Environmental Control

Dover_Airforce_Base1
This project focused on the environmental restoration and stabilization of two segments of eroded riverbank along the St. Jones River in Delaware. Trihydro was the prime contractor for the project team.

The scope of services performed by the Trihydro team for the segments of riverbank included: construction and contract management; clearing of dense vegetation and small trees; placement of Soil Erosion Controls (SECs) and pollution prevention measures to protect St. Jones River water from erosion and runoff from construction activities; installation of toe revetment; backfilling and grading; placement of topsoil and construction of live soil lifts; planting and seeding; final inspection; and preparation of a summary report including as-built drawings. Work was conducted around significant tidal variations in river elevation and seasonal conditions that precluded construction during winter months. 

For one of the segments, Trihydro expedited work and prevented further degradation of the riverbank through the initial implementation of minor surface grading, fill and installation of coconut netting during the initial, winter period of non-construction.  Based on surveys of previously planted areas, Trihydro proposed and implemented no-cost quality changes in the bank protection design by substituting potted plants for plant bundles and live-staking indicated in the plans.  Implementation required successful negotiation of species and planting program changes with representatives from the Delaware Department of Natural Resources and Environmental Control. Even with these negotiations and changes, construction was completed 51 days ahead of schedule.

For the other segment, several obstacles were encountered during the clearing and grubbing that had not been anticipated or identified in the plans, including a large amount of concrete. The concrete was excavated, stockpiled on site, and hauled off the site for appropriate disposal at no additional cost. A 15-inch storm water outfall pipe was also discovered which was not designated in the plans. A no-cost modification was made to the work plan to taper the bank fill around the outfall pipe and add rip rap protection in front of the outfall to dissipate the water flow as it enters the fringe marsh.  Despite changed conditions, construction was completed within budget and 75 days ahead of schedule.
Back to All Projects
"The quality of Trihydro's work matches the exemplary nature of the individuals performing them."
- Guillermo J. Silva-Wiscovich, Partner, Morell Bauza Cartagena & Dapena LLC

Trihydro’s success is based on working safely, maintaining high quality, and having strong project managers on the front line. Our considerable technical and regulatory expertise allows us to anticipate challenges, recognize opportunities, and strategically work with you to reach well-defined milestones and clearly defined end-state visions.

Headquarters 307-745-7474  |  Contact Us